Week 8 (9/25 - 9/29) of the Colburn Street Dam Rehabilitation Project has come to an end. Below is a summary of the events that took place this week.
- Installed 4 to 5" of shotcrete over the upstream face of the dam
- Excavated behind the cut-off wall for the placement of low permeability material
- Placed low permeability material behind the cut-off wall.