05.24.23 

Approved Revised CY23-CY25 Pavement Management Program

As a result of a $700,000 budget reduction to the Town's Pavement Management Program approved at the May Town Meeting, a revised 3-year program had to be generated for the new budget and approved by the Select Board. 

Engineering Dept  Reports 
05.24.23 

Changes To 01/19/23 Approved CY23-CY25 Pavement Management Program

Originally approved by the Select Board at their January 19, 2023 meeting. This document shows the changes between the Pavement Management Programs approved in January and May. The program had to be revised due to a budget reduction of $700,000 approved at Town Meeting. Those roadways, sidewalks and curb ramps highlighted in yellow are those facilities that will no longer be completed as part of the revised 3-year program as a result of the budget cut.

Engineering Dept  Reports 
 01.02.23

2022 Engineering Department Annual Update

This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with.

Engineering Dept  Reports 
11.22.22

2022 Town-Wide Metering Report

The Town's consultant (Weston & Sampson) performed a town-wide flow metering study to determine peak infiltration and inflow rates within our sewer system.

Engineering Dept  Reports 
10.14.22 

2022 Sewer Manhole Investigations

Weston & Sampson was hired to perform topside manhole investigations as part of our ongoing I/I removal program. The attached report summarizes the results of their investigation

Engineering Dept  Reports 
08.24.22 

Greenlodge Street Corridor Improvements - Plan Set

Dewberry was hired to design improvements along the Greenlodge Street Cooridor from Sprague St to Colwell Dr (South). Those improvements include the installation of approx. 5000' of new asphalt sidewalks with granite curbing, reduced crosswalk lengths, a Rapid Rectangular Flashing Beacon (RRFB) assembly for main Greenlodge School crosswalk, over 20 new concrete accessible ramps and bicycle accomodations.

Engineering Dept  Plans 
04.01.22 

Dedham Culvert & Bridge Asset Management Report

The Engineering Corp. (TEC) completed a Town-wide asset management report for all Town-owned culverts & bridges. The report identifies high risk structures and provides analysis and recommendations for replacement. Due to the size of the report, it has been broken into 3 parts. Please click on the title below to download that particular part of the report.

 

Part 1 - Culverts

Part 2 - Bridges

Part 3 - MassDOT Inspection Reports

Engineering Dept  Reports
01.31.22

2021 Engineering Department Annual Update

This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with

Engineering Dept  Reports 
 11.17.21

Town-Wide Traffic Signal Evaluation

BETA Group, Inc. completed a Town-wide traffic signal evaluation for Town of Dedham owned traffic signals and flashing beacons. The resultant report provides the Town with recommended signal phasing and timing improvements along with short and long term equipment upgrades

Engineering Dept  Reports 
 11.10.21

Greenlodge Street Corridor Improvements - Presentation & Plans

Available for download is the presentation and plans used for the Town-Wide Virtual Public Information Meeting held on 11-10-21. The draft plans for improvements were presented at this meeting along with a Q&A session.

Engineering Dept Presentation & Plans
08.31.21 

2021 Sewer Manhole Investigations

Weston & Sampson was hired to perform topside manhole investigations as part of our ongoing I/I removal program. The attached report summarizes the results of their investigation.

Engineering Dept  Reports 
08.05.21 

2020 Water Quality Report

The Neponset River Watershed Association performs water quality sampling through their Citizen Water Monitoring Network at a sampling station located on Mother Brook at Washington Street. This report summarizes the results of their sampling efforts.

Engineering Dept  Reports 
01.28.21 

2020 Engineering Department Annual Update

This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with

Engineering Dept Reports 
 09.28.20

CY2021 - CY2022 Road Program

CY2021 - CY2022 approved road improvements as endorsed by the Select Board at their September 24, 2020 meeting.

Engineering Dept Reports 
 09.11.20

2020 Sewer Manhole Investigations

Weston & Sampson was hired to perform topside manhole investigations as part of our ongoing I/I removal program. The attached report summarizes the results of their investigation.

Engineering Dept  Reports 
 05.02.20

2019 Water Quality Report

The Neponset River Watershed Association performs water quality sampling through their Citizen Water Monitoring Network at a sampling station located on Mother Brook at Washington Street. This report summarizes the results of their sampling efforts.

Engineering Dept  Reports 
 01.29.20

2019 Engineering Department Annual Update

This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with

Engineering Dept  Reports 
 09.16.19

2019 Sewer Manhole Investigations

Weston & Sampson was hired to perform topside manhole investigations as part of our ongoing I/I removal program. The attached report summarizes the results of their investigation.

Engineering Dept Reports 
 07.25.19

FY2020 - FY2022 Road Program

FY2020 - FY2022 approved road improvements as endorsed by the Select Board at their June 25, 2019 meeting.

Engineering Dept  Reports
 06.26.19

2018 Water Quality Report

The Neponset River Watershed Association performs water quality sampling through their Citizen Water Monitoring Network at a sampling station located on Mother Brook at Washington Street. This report summarizes the results of their sampling efforts.

Engineering Dept   Reports
 04.01.19

Presentation - Private Infiltration Removal Policy

This is a copy of the presentation made at a Town-wide Public Meeting held at the Dedham Middle School Auditorium on 4/1/19

Engineering Dept  Presentation 
 01.28.19

2018 Engineering Department Annual Update

This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with.

Engineering Dept  Reports
 11.15.18

Dedham Square Pedestrian Signal Evaluation - SB Presentation

This is a copy of the presentation made to the SB at their meeting held on 11/15/18. This report was a summary of the report generated by BETA.

Engineering

Dept

Presentation
 11.01.18

Dedham Square Pedestrian Signal Evaluation

BETA was hired to study, evaluate and make recommendations related to pedestrian safety at the intersections of High Street at Washington Street and High Street at Eastern Avenue

Engineering Dept  Reports
 10.01.18

2018 Sewer Manhole Investigation

Weston & Sampson was hired to perform topside manhole investigations as part of our ongoing I/I removal program. The attached report summarizes the results of their investigation.

Engineering Dept  Reports
 08.03.18

2018 Rustcraft Road Pump Station Evaluation

This report summarizes the results of the evaluation for the Rustcraft Road Pump Station performed by Weston & Sampson Engineers in 2018

Engineering Dept Reports 
 03.27.18

FY2019 - FY2021 Road Program 

FY2019 - FY2021 approved road improvements as endorsed by the Select Board at their March 27, 2018 meeting.

Engineering Dept  Reports 
 01.26.18

Colburn St Dam - Phase I Inspection/Evaluation Report

This Inspection/Evaluation Report was conducted by GEI Consultants, Inc. and details the inspection and evaluation of the Colburn Street Dam in accordance with MGL Chapter 253, Sections 44-50 as amended by Chapter 330 of the Acts of 2002.

Engineering Dept  Reports 
 01.18.18

2017 Engineering Department Annual Update

This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with.

Engineering Dept Reports
 10.05.17

McDonald Square 100% Final Design Plans

After public review and comment, the Town's consultant (BETA Group) generated the 100% design plans for the McDonald Square Sidewalk Improvements Project.

Engineering Dept Plans
 09.05.17

McDonald Square 75% Design Public Presentation

The Town's consultant (BETA Group) presented the 75% Design plans for the McDonald Square Sidewalk Improvements project at a public meeting held on 9/5/17 at the Endicott Estate. This design is the result of the Accessibility Study conducted for this area in 2016-2017.

Engineering Dept  Reports 
 08.09.17

Sidewalk Condition Index (SCI)

Map showing the current conditions of the 87 miles of existing Public Way sidewalks as of 12/31/16.

Engineering

Dept

Reports 
 06.15.17

FY2018 - FY2020 Road Program

FY2018 - FY2020 approved road improvements as endorsed by the Select Board at their June 15, 2017 meeting

Engineering

Dept

Reports 
 03.24.17

Final Report - Sewer System Hydraulic Flow Model Update - March 2017

Performed by Weston & Sampson in 2017 to evaluate the Town's sewer system.

Engineering Dept  Reports 
 03.06.17

McDonald Square Accessibility Study

The Town's consultant (BETA Group) was hired to assess the existing pedestrian accessibility and ADA compliance within the McDonald Square study area. The report also includes recommendations based on the field assessment.

Engineering

Dept

Reports 
 02.06.17

2016 Engineering Department Annual Update

This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with.

Engineering Dept Reports
 11.01.16

2016 Town-Wide Flow Monitoring Report

The Town's consultant (Weston & Sampson) performed a town-wide flow monitoring study to determine peak infiltration and inflow rates within our sewer system.

Engineering Dept Reports 
04.08.16 

Colburn Street Dam - Phase II Investigation Report

The Town's consultant (Dewberry) was hired to conduct a Phase II Investigation Report on the Colburn Street Dam

Engineering Dept Reports
03.31.16 FY2017 - FY2019 Road Program
FY2017 - FY2019 approved road improvements, as endorsed by the Select Board March 28, 2016.
Engineering Dept Reports
10.08.15  Stormwater BMP Retrofit Development Dedham, MA
The Engineering Dept. partnered with the Neponset River Watershed Association and Nitsch Engineering to identify sites suitable for retrofitting with structural stormwater Best Management Practices (BMPs).
Engineering Dept Reports
08.27.15  2014 Private Building Inspection
This is the Final report as prepared by Weston & Sampson for the 2014 Private Building Inspections.
Engineering Dept Reports
07.23.15 Public Meeting Notice - Colburn Street Bio-Retention Basin Project
Public Meeting being held for anyone interested in becoming fully acquainted with the Project.
Engineering Dept Reports
04.13.15 2014 Smoke Testing Program - March 2015
Final report for the 2014 Inflow Investigation which included smoke and dye testing performed by Weston & Sampson. (Due to the large file size, please contact the Engineering Department for a copy of this document)
Engineering Dept Reports
02.13.15  FY2016 - FY2018 Road Program
FY2016 - FY2018 approved road improvements, as voted by the Select Board February 12, 2015.
Engineering Dept Reports
02.13.15 2014 Engineering Department Update
This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with.
Engineering Dept Reports
11.17.14  Violet Avenue - Riverdale Area Drainage Evaluation Hydraulic Flow Model Report
Hydraulic study performed by Weston & Sampson.
Engineering Dept Reports 
11.14.14  Final Report - Sewer System Hydraulic Flow Model - September 2014
Performed by Weston & Sampson in 2014 to evaluate the Town's sewer system.
Engineering Dept Reports
09.11.14 Colburn Street Dam - Follow-Up Inspection 9/15/2013
Follow-up inspection performed on the Colburn Street Dam in 2013.
Engineering Dept Reports
09.11.14 Colburn Street Dam - Phase 1 Assessment Phase 1
Assessment report on the Colburn Street Dam performed on May 23, 2006.
Engineering Dept Reports
09.04.14 2013 Year One Inflow Investigations - March 2014
Final report for the 2012 Inflow Investigation which included smoke and dye testing performed by Weston & Sampson.
Engineering Dept Reports
04.29.14 2014-2015 Private Building Inspection Program
Presentation made to the SB at their meeting held on March 20, 2014.
Engineering Dept Brochures
01.31.14 Revised - Town of Dedham Sewer Regulations
On 9/19/2013 the Town revised Sections 5.0 and 8.0 of the 2006 Sewer Regulations. These sections refer to State permits and sewer easements.
Engineering Dept Applications
03.18.13 2012 Inflow Investigation Report - Feb 2013
Final report for the 2012 Inflow Investigation which included smoke and dye testing performed by Weston & Sampson.
Engineering Dept Reports
03.18.13 Inflow & Infiltration Investigation and Rehabilitation Report - Feb 2013
Report generated in Feb 2013 by Weston & Sampson to aid the Town of Dedham in its annual I/I program.
Engineering Dept Reports
01.04.13 FY2013 Pavement Management Summary Report
This memorandum was presented to the SB at their January 3, 2013 meeting. The report summarizes the road improvements which were undertaken over the past construction season.
Engineering Dept Reports
10.26.12 Final Report - Municipal Building Inspections
Final report summarizing the results of the Municipal Building Inspections performed by Weston & Sampson.
Engineering Dept Reports
01.27.12 Traffic Calming Policy Traffic Calming Policy - Adopted 1/26/2012 Engineering Dept Reports

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer